All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, Basic Maintenance of Internal Connections (BMIC), leased Managed Internal Broadband Services equipment (Category Two) or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B and/or Project C. Bids for individual components of a single project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project D, Project E, Project F, Project G and/or Project H. Bids for individual components of a single project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
· DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project. Bids for individual components of the entire Project I will be disqualified.
UPDATE 10.18.22 - IFCB has been updated to include 5 year licensing needed for both the WAPs and switches. Project C, Wireless Controller specs have been updated from WIFI 5 to WIFI 6.
Category Two:
VOLUNTARY SITE VISIT
Vendors wishing to bid on C2 can attend a voluntary site visit from October 19th, 2022, through October 21st, 2022. Vendors will meet at the Admin Office, 401 Antelope Blvd, Whiteface TX, 79379. Vendors should RSVP to Devin Sonnenburg at dsonnenburg@whitefaceschool.net to set up a time for a site visit October 19th, 2022, through October 21st, 2022. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.
INTERNAL CONNECTIONS
The district is upgrading their infrastructure. Bids should include an SLA, warranted that equipment is purchased. Bids should include 5-year licensing for WAPs and switches.
Project A – Firewall
No installation needed.
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Firewall Service and Components |
2 |
No preference |
Project B – Network Equipment
Installation and configuration needed for the switches and routers.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Caching Server |
2 |
No preference |
Router |
5 |
Aruba or Cisco/Meraki |
Switches |
20 |
Aruba or Cisco/Meraki |
UPS |
25 |
APC or Tripp Lite – must be rackmountable |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
Project C – Wireless
Installation needed for the cabling and WAPs.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Cabling |
200 |
CAT 6 cabling drops |
Cabling |
40 |
Panduit 48 port CAT 6 patch panels |
Wireless Access Points |
110 |
Indoor - Cisco Aironet Catalyst Meraki (802.11AC) Backward compatible if possible – indoor and outdoor |
Wireless Access Points |
15 |
Outdoor – Cisco Aironet Catalyst Meriaki WIFI 6 (802.11ax) Backward compatible if possible – indoor and outdoor |
Wireless Controller |
2 |
Cisco 5 GB throughput min. On premise and or cloud operational flexibility WIFI 5 6 up to 250 waps |
NOTE: We are requesting WAP or Controller licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B and/or Project C. Bids for individual components of a single project will be disqualified.
BASIC MAINTENANCE OF INTERNAL CONNECTIONS:
Project D – Firewall (manufacturer’s support)
The district would like a manufacturer’s support contract for these items:
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Firewall Service and Components |
2 |
No preference |
Project E – Firewall (block of hours)
The district would like a block of 10 hours per month for the support of eligible equipment.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Firewall Service and Components |
2 |
No preference |
Project F - Network equipment (manufacturer’s support)
The district would like a manufacturer’s support contract for these items
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Caching Server |
2 |
No preference |
Router |
5 |
Aruba or Cisco/Meraki |
Switches |
20 |
Aruba or Cisco/Meraki |
UPS |
25 |
APC or Tripp Lite – must be rackmountable |
Project G – Network equipment (block of hours)
The district would like a block of 10 hours per month for the support of eligible equipment.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Caching Server |
2 |
No preference |
Router |
5 |
Aruba or Cisco/Meraki |
Switches |
20 |
Aruba or Cisco/Meraki |
UPS |
25 |
APC or Tripp Lite – must be rackmountable |
Project H – Wireless (manufacturer’s support):
The district would like a manufacturer’s support contract for these items:
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Wireless Access Points |
110 |
Indoor - Cisco Aironet Catalyst Meraki (802.11AC) Backward compatible if possible – indoor and outdoor |
Wireless Access Points |
15 |
Outdoor – Cisco Aironet Catalyst Meriaki WIFI 6 (802.11ax) Backward compatible if possible – indoor and outdoor |
Wireless Controller |
2 |
Cisco 5 GB throughput min. On premise and or cloud operational flexibility WIFI 5 up to 250 waps |
DISQUALIFICATION FACTOR BMIC: Service providers are required to bid an entire Project D, Project E, Project F, Project G and/or Project H. Bids for individual components of a single project will be disqualified.
DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
Managed Internal Broadband Service (MIBS):
MIBS Project I -
Leased device and service to manage our wireless access points, approximately 125 WAPs
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Wireless Access Points |
5 |
Wyebot type service/device or functionally equivalent leased devices and service are requested. Wi-Fi monitoring with 5 year agreement. |
DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project. Bids for individual components of the entire Project I will be disqualified.
2023_C2_Bidding_Instructions75.docx |
WHITEFACE_C2_COVER_PAGE_.pdf |
Answer:
40 would be the highest amount that we could possibly need. For the sake of comparing “apples to apples” it would be best if vendors bid the requested 40. Aruba 2930F layer 3 switches POE (48P) would be our preferred make and model.
Answer:
Tripp Lite SMART1500LCD 1500VA Smart UPS Battery Back Up, 900W Rack-Mount/Tower, LCD, AVR, USB, DB9