All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Granite ISD 3
IFCB Posted : Nov 21, 2022
Bid Deadline : Wednesday, Jan 11, 2023

Questions Due By : Wednesday, Dec 7, 2022
Applicant Address : Granite, OK 73547
IFCB ID : 230005649

IFCB Requirements :

·        All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.

 

·        Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·        Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·        By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·        Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·        Contracts must not prohibit SPIN changes.

 

·        Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·        Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·        All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·        All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.

 

·        All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·        If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.

 

·        The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.


Services and Equipment Requested :

UPDATE: THE BID DEADLINE HAS BEEN UPDATED TO 01/11/2023.

Category Two:

VOLUNTARY SITE VISIT

Vendors wishing to bid on C2 can attend a voluntary site visit either December 1, 2022, or December 6, 2022. Vendors should RSVP to Missy Berry at mberry@granite.k12.ok.us  to set up a time for a site visit on December 1, 2022, or December 6, 2022. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.

 

INTERNAL CONNECTIONS

No installation needed.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

6000ft

approximately 6,000 ft of CAT 6 cabling

Switches

6

Ubiquiti 48 port PoE

UPS/Battery Backup

4

1500 AVR (automatic voltage regulation) (line conditioner)

Wireless Access Points

8

Ubiquiti

 

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Wireless Access Points must be compatible with existing Ubiquiti Unifi network equipment.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components of the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2023_C2_Bidding_Instructions145.docx
GRANITE_C2_COVER_PAGE_.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Cabling = Do you have a color preference? Is the cable for indoor or outdoor? UPS = Are you needing rack mount or stand alone? Access Points = Do you have a preferred model number? etc. UAP-AC-PRO, U6-Pro

Answer:

Cabling:  6k of indoor cabling,  no color preference

UPS:  stand alone

AP's:  GPS wireless network is composed solely of Ubiquiti UniFi devices and they currently only use UAP-AC-PRO devices currently.  We will accept any AP's that are Ubiquiti UniFi compatible.  Preferably UAP-AC-PRO.

Hi, just want to make sure that you need just drop ship to location and you don't need installation ? Wi-Fi 5, 6 or 6E APs ? Thank you

Answer:
We will be completing our own installation. 6 will be most compatible to GPS devices currently.

Hi, do you need additional patch cords, patch panels ? Thank you

Answer:
No patch cords or panels needed.

UPS: Are the UPS units rack mount???????????? Are they going into wall mount racks/cabinets??????????? If so, what is the depth of those racks/cabinets???? WIRELESS ACCESS POINTS: --Which classrooms or areas will the AP’s be installed in? SWITCHES: --Are the 6 switches going into the IDF and MDF network locations in the main building? --It was stated on the site visit that no transceivers will be needed, correct? --So, there will be no fiber coming into any of these new switches and those will stay in existing switches that are to remain in the network. CAT6 CABLING: --1A: During site visit it was stated that the Cat6 network cabling would just run from existing patch panel in the IDF to existing patch panel in MDF Computer Lab. Basically, extensions of existing cabling that run to the IDF. Which rooms are cabled to the IDF location? --1B: There may be some cable runs that could be out of distance by just extending their cable run to the MDF. Will need to leave the IDF as is with appropriate switches and add a copper or fiber run from the IDF to the MDF to connect the network racks together. Unless the distance for any cable runs to the MDF do NOT exceed 300’.

Answer:

UPS Questions:  Asked and answered previously.

AP's:  Primary Building Hallway and Elementary building

Switches:  4 in MDF / 1 in Elementary building / 1 in Special Ed

Transceivers:  Currently utilizing Media Converters and recommend to continue to utilize media converters for Legacy Device compatibility.

Cabling from MDF to IDF:  Your statement is incorrect.  The purpose of the cabling is to remove the IDF and terminate all connections in the main building at the MDF.as extensively discussed during onsite review.

No cable runs will exceed the Ethernet specifications of 300ft