All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· All Questions and Bids must be submitted using the on-line IFCB system. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If the applicant is requesting purchases of new equipment, or maintenance of that new equipment, bids for functionally equivalent equipment will be accepted.
· E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.
· INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.
· INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
· The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, Project D, Project E and/or Project F. Bids for individual components of a single project will be disqualified.
Internet Access – The terminating address for this circuit is located at Pea Ridge JHS – 781 West Pickens, Pea Ridge, AR 72751. Vendors should bid 1 GB through 10 GB, 3- and 5-year terms.
E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.
INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.
INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
Category Two:
INTERNAL CONNECTIONS
IC Project A – Procurve Modular Switches
No installation needed.
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Antennas, Connectors and Related Components |
2 |
Stacking cables compatible with the switches stacking modules listed in Project A |
Antennas, Connectors and Related Components |
27 |
Power supplies capable of providing at least 700 watts of POE+ power and compatible with the switches listed in Project A. Also needs to support208vAC input power. |
Antennas, Connectors and Related Components |
4 |
2-port Stacking modules compatible with the switches listed in Project A. |
Antennas, Connectors and Related Components |
20 |
4 SFP+ port card capable of 10GB compatible with the switches listed in Project A. |
Switches |
14 |
Procurve compatible 48 port switches 48 POE+ 1GB ports. Ability to be managed by IMC software. Model Aruba 2930M or functional equivalent with removable power supplies |
Switches |
16 |
Procurve compatible 24 port switch 24 POE+ 1GB ports. Ability to be managed by IMC software. Model Aruba 2930M or functional equivalent with removable power supplies |
Switches |
1 |
Procurve compatible 16 port SFP switch 16 SFP ports capable of 10GB |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Switches must be compatible with existing IMC software.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project B – Procurve Fixed Switches
No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, Connectors and Related Components |
2 |
Stacking cables compatible with the switches listed in project B |
Switches |
14 |
Procurve compatible 48 port switch 48 POE+ 1GB ports, 4 - SFP+ ports (capable of 10G). Ability to be managed by IMC software Model Aruba 2930F or functional equivalent Needs large enough power supply to support POE+ on all 48 ports concurrently |
Switches |
16 |
Procurve compatible 24 port switch 24 POE+ 1GB ports, 4 - SFP+ ports (capable of 10G) Ability to be managed by IMC software. Model Aruba 2930F or functional equivalent Needs large enough power supply to support POE+ on all 48 ports concurrently |
Switches |
1 |
Procurve compatible16 port SFP switch |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Switches must be compatible with existing IMC software.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project C – Aruba CX M Switches
No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, Connectors and Related Components |
2 |
Stacking cables compatible with the switches listed in Project C. |
Antennas, Connectors and Related Components |
27 |
Power supplies capable of providing at least 700 watts of POE+ power and compatible with the switches listed in Project C. Also needs to support 208vAC input power. |
Switches |
14 |
Aruba CX compatible 48 port switch 48 POE+ 1GB ports. Ability to be managed by IMC software. Capable of supporting 10gb SFPs Model Aruba 6300M or functional equivalent with removable power supplies |
Switches |
16 |
Aruba CX compatible 24 port switch 24 POE+ 1GB ports. Ability to be managed by IMC software. Capable of supporting 10gb SFPs Model Aruba 6300M or functional equivalent with removable power supplies |
Switches |
1 |
Aruba CX compatible16 port SFP switch 16 SFP ports capable of 10GB |
Switch Licenses |
31 |
5-year Aruba Central Licenses to manage the switches listed in Project C. |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Switches must be compatible with existing IMC software.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project D – Aruba CX F Switches
No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, Connectors and Related Components |
2 |
Stacking cables compatible with the switches listed in project D |
Switches |
14 |
Aruba CX compatible 48 port switch 48 POE+ 1GB ports. Ability to be managed by IMC software. Capable of supporting 10gb SFPs. Capable of supporting 720W of PoE+. Model Aruba 6200F or functional equivalent |
Switches |
16 |
Procurve compatible 24 port switch 24 POE+ 1GB ports. Ability to be managed by IMC software. Capable of supporting 10gb SFPs Capable of supporting 720W of PoE+ Model Aruba 6200F or functional equivalent |
Switches |
1 |
Aruba CX compatible16 port SFP switch 16 SFP ports capable of 10GB |
Switch Licensing |
31 |
5-year Aruba Central Licenses to manage the switches listed in Project D |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Switches must be compatible with existing IMC software.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project E – WAP licensing
Five-year WAP licensing needed for existing WAPs. No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Wireless Access Licensing |
5 |
5-year Aruba Central Licenses to manage existing Aruba 636 Access Points |
NOTE: We are requesting WAP switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
IC Project F – Switch Licensing
Five-year licensing for existing switches. No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Switch Licensing |
13 |
5-year Aruba Central Licenses to manage existing 2930M 48-port switches |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS – PROJECT A-D ONLY: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, Project D, Project E and/or Project F. Bids for individual components of a single project will be disqualified.
2023_C2_Bidding_Instructions160.docx |
PEA_RIDGE_C2_COVER_PAGE_.pdf |