All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All contracts awarded under this IFCB bidding process may be voluntarily renewed by the applicant, upon written notice to the provider, for five consecutive one year terms. Please include this language in your final contract.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
· INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
· INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.
· LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
· LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.
· LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project. Bids for individual components of the project will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
12/14/23 The LEASED WAN CIRCUITS Project on this IFCB has been cancelled due to an incorrect quantity listed on the Form 470 for leased lit fiber. A new 470/IFCB has been posted see IFCB#240008926. If you have previously submitted a bid for the LEASED WAN CIRCUITS Project on this IFCB you must submit your bid under the new Form 470/IFCB #240008926.
CATEGORY ONE
INTERNET ACCESS
Applicant currently has 2GB bandwidth connection and is considering upgrading up to 10GB bandwidth. Please provide bids from 2GB up to 10GB in 1GB increments. Applicant prefers a 5-year term contract. Please include service level agreements. The terminating address for this circuit is 4004 Moulton Street, Greenville, TX 75401.
E-rate rules require applicants to evaluate the cost of eligible goods and services, and to cost-allocate out the amount for ineligible services from their funding request. If your company will be bidding internet access service, please identify the amount to be cost-allocated out for the ineligible services – email service, web hosting, content filtering, or other bundled ineligible services.
INTERNET ACCESS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
INTERNET ACCESS DISQUALIFICATION FACTOR: Bids submitted for services to an incorrect address will be disqualified.
LEASED WAN CIRCUITS
12 fiber connections any delivery/technology type. Leased lit fiber bidders should bid 10GB bandwidth. Leased dark fiber bidders should bid 48 strands of fiber. Applicant prefers a 5-year term contract. Please include service level agreements.
From the hub at 4004 Moulton St, Greenville Texas 75401 – Main Administration Building to:
1. 3515 Lions Lair Rd, Greenville Texas 75402 – Greenville High School
2. 3923 Henry St, Greenville Texas 75401 – Houston Education Center
3. 3611 Texas St, Greenville Texas 75401 – Greenville Middle
4. 3201 Stanford St, Greenville Texas 75401 – Greenville Six Grade Center
5. 6005 Stonewall St, Greenville Texas 75402 – Bowie Elementary School
6. 2110 College St, Greenville Texas 75401 – Carver Elementary School
7. 1316 Wolfe City Drive, Greenville Texas 75401 – Crockett Elementary School
8. 6321 Jack Finney Blvd, Greenville Texas 75402 – Lamar Elementary School
9. 9315 Jack Finney Blvd, Greenville Texas 75402 – Katherine Johnson Stem Academy
10. 2504 Carver St, Greenville Texas 75401 – LP Waters Early Childhood Center
11. 3504 King St, Greenville Texas 75401 – Service Center
12. 3703 Templeton St, Greenville Texas 75401 – Transportation Department
LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.
LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Vendors must bid all connections. If vendors submit a bid missing any connection, we will consider your bid incomplete and disqualify your bid.
LEASED WIDE AREA NETWORK CIRCUITS DISQUALIFICATION FACTOR: Bids submitted for services to incorrect addresses will be disqualified.
CATEGORY TWO
INTERNAL CONNECTIONS
Greenville ISD wants to replace their outdated UPS devices district-wide with newer equipment that can support their networking infrastructure. They want to utilize services after-hours to remove and replace the existing UPS equipment.
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
UPS/Battery Backups |
74 |
Vertiv GTX5-1500LVRT2UXL; must be rack mounted |
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project. Bids for individual components of the project will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
Greenville_C2_Cover_Page.pdf |
2024_C2_Bidding_Instructions91.pdf |
Answer:
The equivalent can be quoted. An extended warranty is not required.
Answer:
You can just bid the UPS project if you wish to do so
Answer:
What type of plug do they use to plug into the wall? – NEMA 5-15
What are the existing UPS models? –
UPS model SU1500RTXLCD2U
How many UPS at each location? –
BOW: 5
CAR: 5
CRO: 5
GHS: 17
GMS: 13
HEC: 5
LAM: 6
LPW: 4
NHHS: 3
TRA: 8
WMA: 3
Total: 74
Are we responsible for removing and disposing of the old UPS? –
Yes
Will the customer be responsible for moving their equipment over to the new UPS?
No, plug the existing devices in as configured on the old UPS. There should be more than enough ports compared to our older models
Answer:
Standard warranty is fine. Extended is not needed.
2) Do you want UPS Startup?
No.
3) Would you all like to have a network card for mgmt? Not needed.
Answer:
Please make sure you read the entire IFCB – we are asking for installation and removal of the old equipment: They want to utilize services after-hours to remove and replace the existing UPS equipment.
Answer:
Will the UPS be mounted in 2-post or 4-post racks? •
2 post rack
Does the UPS need to be capable of adding external batteries to increase runtime? •
No
Will the UPS equipment be managed via a SNMP network connection? •
No
What is the desired warranty period?
Standard warranty is fine, extended is not required.
Answer:
Please make sure you read the entire IFCB and submitted questions – we are asking for installation and removal of the old equipment: They want to utilize services after-hours to remove and replace the existing UPS equipment.