All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If for some reason the system is down before the respective deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission.
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified.
· Bidder must agree to participate in USF Program (AKA “E-Rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-Rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-Rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-Rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-Rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· The winning vendor will be required to complete the USAC approved Item 21 template for the project within 7 working days after notification that the vendor has won the bid.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A, PROJECT B, PROJECT C, PROJECT D: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, or Project D. Bids for individual components of a single project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Service providers are required to bid the entire maintenance project. Bids for individual components of the project will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
Category Two:
Vendors wishing to bid on internal connections can attend a voluntary site visit either January 17, 2024 or January 19, 2024, both at 10:00am. Vendors will meet at Decatur High School, 750 East Eagle Summit Drive, Decatur, TX 76234. Vendors will check in with Leon Elsbecker.
INTERNAL CONNECTIONS:
IC Project A – Wireless Access Points 3-year license
Remove existing access points and install new ones. Bids must include installation and configuration costs.
No cabling drops are needed for the wireless access points.
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Wireless Access Points |
360 |
Meraki MR56 |
NOTE: We are requesting WAPs on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
All wireless access points must be compatible with Meraki switches.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project B – Wireless Access Points 5-year license
Remove existing access points and install new ones. Bids must include installation and configuration costs.
No cabling drops are needed for the wireless access points.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Wireless Access Points |
360 |
Meraki MR56 |
NOTE: We are requesting WAPs on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
All wireless access points must be compatible with Meraki switches.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT B: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project C – Router 3-year license
Bids must include installation and configuration costs.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Router |
1 |
Cisco 4507 |
NOTE: We are requesting a router license on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
COMPATIBILITY REQUIREMENT:
The proposed router must be compatible with Meraki switches.
IC Project D – Router 5-year license
Bids must include installation and configuration costs.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Router |
1 |
Cisco 4507 |
NOTE: We are requesting a router license on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
The proposed router must be compatible with Meraki switches.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT D: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A, PROJECT B, PROJECT C, PROJECT D: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B, Project C, or Project D. Bids for individual components of a single project will be disqualified.
BMIC Project E: Firewall
The District would like a manufacturer’s support contract for these items:
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Firewall |
1 |
FortiCare Premium & FortiGuard Enterprise Protection for FortiGate-600F |
BMIC Project F: Router
The District would like a manufacturer’s support contract for these items:
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Router |
1 |
Cisco 4507 |
BMIC Project G: WAPs
The District would like a manufacturer’s support contract for these items:
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Wireless Access Points |
360 |
Meraki MR56 |
DISQUALIFICATION FACTOR BMIC: Service providers are required to bid the entire maintenance project. Bids for individual components of the project will be disqualified.
DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified. Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment. Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.
Decatur_ISD_C2_COVER_PAGE.docx |
2024_C2_Bidding_Instructions139.pdf |
Answer:
Two 48 port blades <--- One 48 port is non POE
Two 8 Port Blade SFP
One 12 port Blade SFP
28 SFP Total
96 Copper ports Total