All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Bentonville School District 6
IFCB Posted : Oct 9, 2024
Bid Deadline : Wednesday, Nov 20, 2024

Questions Due By : Friday, Oct 18, 2024
Applicant Address : Bentonville, AR 72712
IFCB ID : 250002108

IFCB Requirements :

·         Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·        For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·         Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·         Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·         By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·         Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·         Contracts must not prohibit SPIN changes.

 

·         Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·         Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·         All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·         All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·         If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

·         DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·         DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project.  Bids for individual components of the project, or bids that do not include all of the requested items for the project will be disqualified.

·         DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.


Services and Equipment Requested :

10/10/24 UPDATE: MAPS ARE NOW AVAILABLE FOR DOWNLOAD ALONG WITH THIS IFCB. 

INTERNAL CONNECTIONS

High School Building WAP and Switch refresh due to aging equipment.  No cabling drops are needed.  Installation including ceiling, flush, and long arm mounts, is required.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

1

24p SFP + L3 10Gb fiber switch, dual PSU

Switches

17

48p CLS6 PoE switch with SFP + uplink – stacking kit

Switches

50

48p CLS4 PoE switch with SFP + uplink – stacking kit

Switches

3

24p CLS6 PoE switch with SFP + uplink

Switches

1

48p CLS6 PoE switch with SFP + uplink

UPS/Battery Back up

18

2000VA Network connected UPS

UPS/Battery Back up

2

1000VA Network connected UPS

UPS/Battery Back up

2

1000VA Network connected UPS (LI-Ion, non-climate controlled environment)

Antennas, Connectors and Related Components

44

10Gb 10km SMF Optics

Wireless Access Points

140

Aruba AP-635

Antennas, Connectors and Related Components

140

Aruba AP Ceiling Grid Mounts

Wireless Access Points

12

Aruba AP-634

Antennas, Connectors and Related Components

48

Aruba AP-634 Antennas

Antennas, Connectors and Related Components

12

Aruba AP Flush Mounts

Wireless Access Points

3

Aruba AP-675

Antennas, Connectors and Related Components

3

Aruba AP-675 Long arm mounts

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT

All equipment must be compatible with existing Aruba 7240 XM controllers.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

MANAGED INTERNAL BROADBAND SERVICES

The district is requesting MIBS for the below existing equipment.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

UPS/Battery Back up

2

Symmetra PX UPS 30k VA

 

DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire project.  Bids for individual components of the project, or bids that do not include all of the requested items for the project will be disqualified.

DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.


There is an additional document associated with this IFCB. Please click the buttons to download the document.

Bentonville_C2_COVER_PAGE1.pdf
2025_C2_Bidding_Instructions46.pdf
BWHS-Access-Point-Locations.pdf

You need to login / register to upload bid.

Questions Received with Applicant Answers   ( Ask Questions? )




Will you be scheduling any on-site walkthroughs to discuss the installation?

Answer:

We will not be providing any walkthroughs.

Will any maps be provided to vendors bidding on the installation?

Answer:
Maps have been added to the IFCB as attachments. 

Are you aware of any locations that will require a lift to mount the APs?

Answer:

Yes. There will be at least one, possibly two locations where a lift is needed.

Add the P/Ns to create a quote (BOM)

Answer:
Included in the picture below.

Add the license terms per P/N and the P/N itself.

Answer:

No licenses are needed.

Are there any Cabling runs required or is this simple AP Swap? Please confirm if configuration is required for Access Points? Please confirm Asset Tagging requirements if required and any additional details to meet school standards.

Answer:

No cabling runs required, AP swap only. No configuration required. No asset tagging required however device physical location (Room number or location description) will need to be documented by MAC address for future configuration and naming.