All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Clinton ISD 99
IFCB Posted : Aug 19, 2024
Bid Deadline : Wednesday, Oct 2, 2024

Questions Due By : Friday, Aug 30, 2024
Applicant Address : Clinton, OK 73601
IFCB ID : 240026212

IFCB Requirements :

·        Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·       For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·        Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·        Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·        By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·        Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·        Contracts must not prohibit SPIN changes.

 

·        Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·        Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·        All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·        All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·        If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·        LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

·        LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.

·        DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.


Services and Equipment Requested :

UPDATE 9/4/24: Q&A from the site visits are now available to download. The bid deadline has been extended to 10/2/24.

Category 1

Leased Lit Fiber – 1 x 10GB circuit from 1001 Orient Ave, Clinton, OK 73601 to 2100 Jaycee Lane, Clinton, OK 73601. Please provide pricing for leased switches and a 3 year term.

NOTE: Applicant will accept any technologies bid. It is our intention to meet all OUSF Fair and Open Competitive Bidding requirements. If you are a NECA/tariffed company, bids for your tariffed rates are allowed. If any of the specified bandwidth speeds are not a tariffed/NECA rate, please bid the closest rate you have available, within the limits of the bandwidth range specified on the 470.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Any and all installation charges must be identified on your bid. If you submit a bid indicating that installation charges may apply without listing those charges, we will consider your bid incomplete and disqualify your bid.

LEASED LIT FIBER DISQUALIFICATION FACTOR: Bidders who are not eligible to provide OUSF support will be disqualified. By placing a bid for these services, the bidder agrees to file the completed OUSF affidavit within 90 days of the start of service (applicant agrees to complete their portion in a timely fashion after the request for completion by the winning bidder).

Bus Wi-fi Services – Please provide bids for bus wi-fi services for 10 buses. Minimum 1.5 Mb up to 25 GB bandwidth. No equipment is needed.

 

Category 2

Internal Connections

Project A – Network Equipment

No cabling drops are needed for the switches or AP.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

50

Ubiquiti Smart Power Cable USP-CABLE

Switches

5

Ubiquiti USW-Pro-Aggregation

Switches

15

Ubiquiti USW-Pro-Max-48-PoE (720W)

UPS/Battery Backup

12

Ubiquiti Power Distribution High Density USP-PDU-HD

UPS/Battery Backup

25

Ubiquiti Power Backup USP-RPS

UPS/Battery Backup

20

Cyberpower PR1500RT2U

Wireless Access Points

60

Ubiquiti U7-Pro-Max

Wireless Controller

1

Ubiquiti Cloudkey Enterprise CK-Enterprise

NOTE: We are requesting WAP or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

COMPATIBILITY REQUIREMENT

All AP and switches must be compatible with existing Ubiquiti Controller. 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

Project B – Firewall

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Firewall

1 year

Sonicwall Advanced Protection Service Suite for NSA 6700

NOTE: We are requesting firewall services on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

Project C – Fiber Runs

Vendors wishing to bid on Project C can attend a voluntary site visit either August 28, 2024 at 10:00am or August 29, 2024 at 1:00pm. Vendors should report to Southwest Elementary, 1903 Opal Avenue, Clinton, OK 73601.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

1

Fiber from SES MDF to SES office – approx. 200ft

Cabling

1

Fiber from SES MDF to SES Gym – approx. 300ft

Cabling

1

Fiber from CHS dome to Weight Room – approx. 275ft

Cabling

1

Fiber from WES MDF to WES Gym – approx. 250 ft

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C.  Bids for individual components of a single project will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

CLINTON_ISD_99_C2_COVER_PAGE.pdf
2025_C2_Bidding_Instructions3.pdf
Questions_and_Answers.docx

Questions Received with Applicant Answers   ( Ask Questions? )




Does Project A need installation?

Answer:

We are not requesting installation for Project A