All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school South Pike County Sch Dist
IFCB Posted : Sep 5, 2024
Bid Deadline : Tuesday, Oct 22, 2024

Questions Due By : Tuesday, Sep 24, 2024
Applicant Address : Murfreesboro, AR 71958
IFCB ID : 240026314

IFCB Requirements :

·       Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·      For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·       Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·       Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·       By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·       Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·       Contracts must not prohibit SPIN changes.

 

·       Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·       Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·       All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·       All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·       If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, Project B and/or Project C.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.


Services and Equipment Requested :

Category Two:

MANDATORY SITE VISIT

Vendors wishing to submit bids for Project A, Project B or Project C must attend one of two mandatory site visits. The site visits will be held on either September 16, 2024 or September 23, 2024. Vendors should RSVP to Adam Coleman at adam.coleman@rattlers.org to set up a time for a site visit on September 16, 2024 or September 23, 2024. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED. Bids from vendors who did not attend either of the site visits will be disqualified.

 

INTERNAL CONNECTIONS

The district would like to replace switches and UPS devices on their campus. Cabling will be used to clean up new switches in server room. Installation and configuration needed for switches.

 

PROJECT A – 1 YEAR LICENSING OPTION.

NOTE: the district will move forward with either project A, B or C, not all three.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

Approximately 2000 ft

Single mode 10 GB Fiber optics

Switches

25

Aruba CX 48 port PoE 10 GB with 1 year licensing

Switches

5

Aruba CX 12 port PoE with 1 year licensing

UPS/Battery Backup

18

NIC Technologies lithium ion with 10 year warranty

 

NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Switches must be compatible with existing Aruba Central management.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

PROJECT B – 3 YEAR LICENSING OPTION.

NOTE: the district will move forward with either  project A, B or C, not all three.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

Approximately 2000 ft

Single mode 10 GB Fiber optics

Switches

25

Aruba CX 48 port PoE 10 GB with 3 year licensing

Switches

5

Aruba CX 12 port PoE with 3 year licensing

UPS/Battery Backup

18

NIC Technologies lithium ion with 10 year warranty

 

NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Switches must be compatible with existing Aruba Central management.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

 

PROJECT C – 5 YEAR LICENSING OPTION.

NOTE: the district will move forward with either  project A, B or C, not all three.

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

Approximately 2000 ft

Single mode 10 GB Fiber optics

Switches

25

Aruba CX 48 port PoE 10 GB with 5 year licensing

Switches

5

Aruba CX 12 port PoE with 5 year licensing

UPS/Battery Backup

18

NIC Technologies lithium ion with 10 year warranty

 

NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

Switches must be compatible with existing Aruba Central management.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware Project A, Project B and/or Project C.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors who wish to bid must attend one of two mandatory site visits. Vendors who submit a bid but have not attended a meeting will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

SOUTH_PIKE_C2_COVER_PAGE.pdf
2025_C2_Bidding_Instructions9.pdf

Questions Received with Applicant Answers   ( Ask Questions? )




Please provide Part# to narrow down the ask.

Answer:

JL727b for the 48 port 

Jl725b for the 24 

Jl678a for the 12 port 

 

We want at least a one year license but would rather have a 5 yr license. 

Please provide Part# and terms for the Licenses

Answer:

JL727b for the 48 port 

Jl725b for the 24 

Jl678a for the 12 port 

 

We want at least a one year license but would rather have a 5 yr license. 

Since the current integrator controls and manages the Aruba Central Management Software, will the winning bidder gain access to the software and if so what version of software is running?

Answer:

Yes they would get access to the software and our switches need to have the most current software loaded.