All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C. Bids for individual components of a single project, or bids that do not include all of the requested items for a single project will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: Vendors who wish to bid must attend a mandatory site visit. Vendors who submit a bid for Project A but have not attended a meeting will be disqualified.
Category 2
Internal Connections
Mandatory Site Visits – Vendors wishing to bid on Project A must attend a mandatory site visit one day the week of November 18, 2024 through November 22, 2024. Vendors will report to 310 N School Dr, Hermitage, AR. Vendors should RSVP to Nevada Johnson nevada.johnson@hermitageschools.org to set up a time for one of these dates between 8:00am and 3:30pm. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.
Project A – Switch Rack Rewire/Cleanup
District would like to rewire all switch racks so they are more functional. Installation and configuration needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Cabling |
20 |
Rack rewiring/clean up, no preference |
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS PROJECT A: Vendors who wish to bid must attend a mandatory site visit. Vendors who submit a bid for Project A but have not attended a meeting will be disqualified.
Voluntary Site Visits – Vendors wishing to bid on Project B or Project C can attend a voluntary site visit one day the week of November 18, 2024 through November 22, 2024. Vendors will report to 310 N School Dr, Hermitage, AR. Vendors should RSVP to Nevada Johnson nevada.johnson@hermitageschools.org to set up a time for one of these dates between 8:00am and 3:30pm. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.
Project B – UPS
No installation needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
UPS/Battery Backup |
14 |
Tripplite |
Project C – Gym Switch
Installation and configuration of new switch needed.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Switches |
2 |
Aruba 48 port POE with 5 year licensing |
NOTE: We are requesting switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bids disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C. Bids for individual components of a single project, or bids that do not include all of the requested items for a single project will be disqualified.
HERMITAGE_C2_COVER_PAGE1.pdf |
2025_C2_Bidding_Instructions103.pdf |
Answer:
TAA SmartPro 120V 1.5kVA 1.35kW Line-Interactive Sine Wave UPS, 2U, Extended Run, Network Card Options, LCD, USB, DB9
This model or Newer model with same specs.
Answer:
Project A - Switch Cleanup / Rewire Cleanup
a. All 14 closets.
a. Patch panels cleaned up. Can reuse cable if needed but needs it to be functional.
a. Yes, all similar.
a. 13 racks
a. 14 total some have modules
a. Yes, no need for replacement.
Project B - UPC Backup Batteries for Switch Racks
a. Yes
Project C - Switch replacements & Installation at the Gym
a. We prefer Aruba.