All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Service providers are required to bid the entire hardware project. Bids for individual components of the project, or bids that do not include all of the requested items for the project will be disqualified.
· DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bid disqualified.
SERVICES SECTION
Category One:
Category 1 Network Equipment-
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Switches |
1 |
8 SFP+ port aggregation switch |
The switch, must be compatible with existing Ruckus equipment and management.
DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Service providers are required to bid the entire hardware project. Bids for individual components of the project, or bids that do not include all of the requested items for the project will be disqualified.
DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: Vendors must complete and include the C1 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR C1 NETWORK EQUIPMENT: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist. Vendors that submit bids that include these manufacturers will have their bid disqualified.
NAVAJO_C1_COVER_PAGE2.pdf |
Answer:
ICX8200-24P switches.
R550 WAP's.
Ruckus.cloud control.
Answer:
Currently:
ICX8200-24P switches, in 3 gangs, (2 of 3, 1 of 2).
26 R550 WAPs, across those 3 switch gangs.
The new switch should be controlled through the same Ruckus Cloud account, with a subscription duration that is at least 5 years out.
Our controller is off-premises, cloud-based.
We will need SFP+ optics, as some of the existing infrastructure modules are not recognized by the Ruckus switches. Shoot for 10GBps, and I think I have adequate SM infrastructure, but the aggregator switch will connect to, probably, 2 switches in the same room, so probably best to include at least 2 short bi-directional SM patch cables in the bid, terminated LC-LC. (One connection in the room is the hand off from our ISP, Whether or not there will be another depends on how many RJ45 ports the SFP+ switch has, in addition to the SFP+ ports, (I need a minimum of 5 copper connections, at present, including 2 servers, 2 rooms, and the WAP, and would be more comfortable with 8+ RJ45 ports, so MAY still need another managed switch besides the SFP+ aggregator switch.))
I would gladly accept a pair of short DACs, (not more than 1 meter), in lieu of optics and patch cables for the server room.
Answer: