All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.

school Vinita ISD 65
IFCB Posted : Oct 25, 2024
Bid Deadline : Friday, Dec 13, 2024

Questions Due By : Friday, Nov 15, 2024
Applicant Address : Vinita, OK 74301
IFCB ID : 250003503

IFCB Requirements :

·       Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).

·      For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.

 

·       Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.

 

·       Please include the correct Service Provider Identification Number (SPIN) on your bid.

 

·       By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.

 

·       Bidder is expected to provide the lowest corresponding price per E-rate rules.  See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.

 

·       Contracts must not prohibit SPIN changes.

 

·       Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).

 

·       Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.

 

·       All contracts awarded will be contingent upon E-rate funding and final board approval.  The applicant may choose to do all or part of the project upon funding notification.

 

·       All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.

 

·       If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components, or bids that do not include all of the requested items for the project of the project will be disqualified.

 

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

·       DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

·       DISQUALIFICATION FACTOR BMIC: Service providers are required to bid the entire maintenance project.  Bids for individual components of the project will be disqualified.

·       DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·       DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.

·       DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

·       DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire Project C and/or Project D.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


Services and Equipment Requested :

Category Two:

VOLUNTARY SITE VISIT

Vendors wishing to bid on C2 can attend a voluntary site visit either November 7, 2024 or November 14, 2024. Both will begin at 10am. Vendors will meet at Ewing Halsell Middle School, 226 N. Miller Street, Vinita, OK 74301. Vendors should RSVP to Brad Breshears breshebc@vinitahornets.com. THIS EMAIL IS TO RSVP ONLY. ALL QUESTIONS AND BIDS MUST STILL BE SUBMITTED VIA THE IFCB. BIDS NOT SUBMITTED VIA THE IFCB WILL BE DISQUALIFIED.

 

INTERNAL CONNECTIONS

IC PROJECT A – Network Equipment

Bids should include installation and configuration.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

11

Drops for WAPs

Cabling

4,000 ft

CAT 6e cabling

Switches

2

Cisco C9300X-24Y

Switches

7

Cisco C9300X-48HX

UPS/Battery Backup

1

APC SRT5KRMXLT

UPS/Battery Backup

2

APC SRT5KRMXLT-5KTF

UPS/Battery Backup

2

APC SRT192RMBP

UPS/Battery Backup

6

APC APCRBC140

UPS/Battery Backup

10

APC SMTL1500RM3UCNC

Wireless Access Points

50

Ubiquiti UAP-AC-HD

 

NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).

 

COMPATIBILITY REQUIREMENT:

 

Equipment must be compatible with existing Ubiquiti network.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid the entire hardware project.  Bids for individual components, or bids that do not include all of the requested items for the project of the project will be disqualified.

 

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.

DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.

 

BASIC MAINTENANCE OF INTERNAL CONNECTIONS:

BMIC Project B – Network Equipment

The district would like a block of 40 hours per month for the support of eligible equipment.

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Cabling

11

Drops for WAPs

Cabling

4,000 ft

CAT 6e cabling

Switches

2

Cisco C9300X-24Y

Switches

7

Cisco C9300X-48HX

UPS/Battery Backup

1

APC SRT5KRMXLT

UPS/Battery Backup

2

APC SRT5KRMXLT-5KTF

UPS/Battery Backup

2

APC SRT192RMBP

UPS/Battery Backup

6

APC APCRBC140

UPS/Battery Backup

10

APC SMTL1500RM3UCNC

Wireless Access Points

50

Ubiquiti UAP-AC-HD

 

DISQUALIFICATION FACTOR BMIC: Service providers are required to bid the entire maintenance project.  Bids for individual components of the project will be disqualified.

 

DISQUALIFICATION FACTOR BMIC: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR BMIC: Maintenance bids listing only an hourly rate and not a monthly or annual total will be disqualified.  Vendors quoting an hourly rate are required to also a) confirm that you have the ability/expertise to maintain all of the equipment listed and b) propose a number of hours at a particular rate monthly to properly maintain the entire list of equipment.  Bids that contain only hourly rates, without confirmation that the company can service the list of equipment, or without a monthly total will be disqualified.

Managed Internal Broadband Service (MIBS):

 

MIBS Project C – Existing Network

The district would like MIBS services for the following existing equipment

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Router

2

MikroTik CCR-1036

Switches

2

Cisco Catalyst 4900M

Switches

2

Cisco 2960S 10G

Switches

8

Cisco 2960S POE + 10G

Switches

32

Cisco 2960 S

Switches

2

Cisco 2960 X

Switches

4

Extreme Summit X460-G2-48P-10GE4

Switches

1

Netgear GS728TP

 

MIBS Project D – New Switches

The district would like MIBS services for the following existing equipment

 

Type of Equipment

Quantity Vendor Should Bid

 

Preferred Make/Manufacturer

Switches

2

Cisco C9300X-24Y

Switches

7

Cisco C9300X-48HX

 

DISQUALIFICATION FACTOR MIBS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.

DISQUALIFICATION FACTOR MIBS: Service providers are required to bid the entire Project C and/or Project D.  Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.

 


There is an additional document associated with this IFCB. Please click the buttons to download the document.

2025_C2_Bidding_Instructions80.pdf
VINITA_C2_COVER_PAGE.pdf

You need to login / register to upload bid.

Questions Received with Applicant Answers   ( Ask Questions? )




Is installation required for Category 2, project A? Or can we just bid the equipment?

Answer:

Installation is required for the Category 2, Project A

You need to login / register to post question.