All bid deadlines are 11:59pm Pacific Time the date of the bid deadline listed unless otherwise noted.
· Before the listed deadlines, all Questions and Bids must be submitted using the on-line IFCB system. Bids submitted before the bid deadline outside of this system will be disqualified. If the system is down before the deadline, please email your bid to info@crwconsulting.com or fax it to 918.445.0049. Bids or questions submitted in this fashion will be disqualified if the on-line system is active at the time of submission. The applicant reserves the right to request and obtain bids outside of the website system if the bid deadline has passed and zero or one bid is received (the intent for this is to follow USAC guidance on obtaining cost-effective bids).
· For all requested services and/or products listed on this IFCB: proposals that include generic/encyclopedic price lists will be considered non-responsive and will be disqualified. SPAM and/or robotic responses will not be considered valid bid responses and will be disqualified from consideration.
· Bidder must agree to participate in USF Program (AKA “E-rate”) for the corresponding funding year.
· Please include the correct Service Provider Identification Number (SPIN) on your bid.
· By submitting a bid, bidder certifies that the bidder does have a valid (non-red light status) SPIN for the E-rate program at the time of submission. Should the Applicant discover that the bidder is on red light status, or if the FCC classifies the bidder as on red-light status before work is performed and invoices are paid, the contract will be null and void and the applicant will have no payment obligations to the bidder.
· Bidder is expected to provide the lowest corresponding price per E-rate rules. See https://www.usac.org/e-rate/service-providers/step-2-responding-to-bids/lowest-corresponding-price/ for details.
· Contracts must not prohibit SPIN changes.
· Bidder must agree to provide the Applicant the choice of discount methods (SPI or BEAR).
· Bidder will be automatically disqualified if the District determines that the bidding company has offered any employee of the District any individual gift of more than $20 or gifts totaling more than $50 within a 12 month period. This does not apply to the recent FCC exemptions of the Gift Rule for the COVID pandemic.
· All contracts awarded will be contingent upon E-rate funding and final board approval. The applicant may choose to do all or part of the project upon funding notification.
· All applicable fees, surcharges, and taxes must be identified on the bid. E-rate rules require the applicants to evaluate the price of eligible goods and services that will be listed on the 471 application during the competitive bidding process. Fees and surcharges that apply but are not listed on the bid will be the responsibility of the bidding company, should their bid be awarded.
· If there is a request for Internal Connections (Category Two) equipment, or Category One equipment listed on this IFCB the applicant will accept bids for functionally equivalent equipment.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS-PROJECT B & C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
· DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B or Project C. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
Category Two:
INTERNAL CONNECTIONS
IC Project A – Cabling
Installation needed. Fiber run from HS to new HS annex.
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
|
Cabling |
Approx 400 FT |
Fiber run |
IC Project B – Network Equipment A
Installation needed. Cat 6 drops of various lengths depending on the distance from the network closet. Cabling must be terminated properly in the classroom as well as to a patch panel. The wall rack will need to accommodate the patch panels for the wiring, the network switches, as well as the UPS.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, connectors, related components |
1 |
Patch panels (48 port/2x24port) |
Cabling |
48 |
CAT 6 cabling drops |
Racks |
1 |
No preference – wall rack |
Switches |
1 |
Unifi 24 port |
Switches |
1 |
Unifi 48 port |
Modules, GBIC, transceivers |
4 |
No preference - Modules to connect switches to fiber network |
UPS/Battery Backup |
1 |
No preference. Standard wall outlet, approx. 30 min run time. |
Wireless Access Points |
5 |
Unifi UAP-nanoHD |
NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Equipment must be compatible with existing Unifi wireless controller.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS-PROJECT B & C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
IC Project B – Network Equipment B
Installation needed. Cat 6 drops of various lengths depending on the distance from the network closet. Cabling must be terminated properly in the classroom as well as to a patch panel. The wall rack will need to accommodate the patch panels for the wiring, the network switches, as well as the UPS.
Type of Equipment |
Quantity Vendor Should Bid
|
Preferred Make/Manufacturer |
Antennas, connectors, related components |
2 |
Patch panels (24port) |
Cabling |
48 |
CAT 6 cabling drops |
Racks |
1 |
No preference – wall rack |
Switches |
1 |
Unifi 24 port |
Switches |
1 |
Unifi 48 port |
Modules, GBIC, transceivers |
4 |
No preference - Modules to connect switches to fiber network |
UPS/Battery Backup |
1 |
No preference. Standard wall outlet, approx. 30 min run time. |
Wireless Access Points |
5 |
Unifi UAP-nanoHD |
NOTE: We are requesting WAP and/or switch licenses on this IFCB, which sometimes may be categorized as BMIC or MIBS by USAC (the BMIC and MIBS boxes on the 470 have been checked to cover this scenario).
COMPATIBILITY REQUIREMENT:
Equipment must be compatible with existing Unifi wireless controller.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: The applicant will not accept bids from manufacturers of equipment deemed a national security threat by the Federal Communications Commission. The list of prohibited equipment is available here: https://www.fcc.gov/supplychain/coveredlist . Vendors that submit bids that includes these manufacturers will have their bid disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Vendors must complete and include the C2 Cover Page with their bid. Bids received without the cover page will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS-PROJECT B & C: It will be the bidder’s responsibility to provide documentation about the compatibility requirements listed in this IFCB. Vendors that submit bids without documentation demonstrating the required compatibility listed in this IFCB will have their bids disqualified, unless that vendor has bid the preferred make/model number listed.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Applicant will not accept bids for refurbished equipment. Any bids containing refurbished equipment will be disqualified.
DISQUALIFICATION FACTOR INTERNAL CONNECTIONS: Service providers are required to bid an entire Project A, Project B and/or Project C. Bids for individual components, or bids that do not include all of the requested items for the project will be disqualified.
2025_C2_Bidding_Instructions196.pdf |
PRESTON_C2_COVER_PAGE3.pdf |
PSR2025_A1.pdf |
Preston_School_Ariel_View.pdf |
Answer:
Unfortunately this is for new construction that hasn’t started yet. We’ve added one drawing of the building as an attachment, I’m sorry we can’t provide more details.
Answer:
Confirm that 5 of the 48 runs will be for APs? Correct.
Assuming requested 5 APs are going in new annex. Correct
How many different in each room will the remaining 43 runs go? 12 will go in the classroom. 31 in the lab
Is construction installing conduit inside walls or do we need to provide wall tracking and boxes? Conduit set by construction
--What is the building construction – type of walls for data locations: Sheetrock, Cinder Block, etc.? This will be a safe room building, ICF walls.
--What is the building construction – type of ceiling: Drop (ceiling tiles), Open, Solid? Drop ceiling.
--Will a lift be needed for any cabling runs? No, 10 ft below ceilings.
FIBER CABLING: --Is the requested fiber cabling indoor or outdoor or a combination? The fiber will originate in the existing HS and outdoors to the annex.
--If outdoor, will trenching or boring be required? Fiber needs to be ran overhead
--If outdoor, will aerial be needed, from building to building or pole to pole? -Yes, pole to pole. 3-5 poles to be provided by installer
-Are there maps showing where fiber cabling is to be run from and to? --An aerial view for outdoor fiber works very well.
MAP ATTACHED
--Is the requested fiber cabling to be multi-mode or single-mode? Multi-mode fiber is sufficient.
--Do you need 1G or 10G connectivity? 10 G Connectivity
--Is the new HS Annex a safe room? If so, will construction provide access into building? Yes, access will be provided
RACK/CABINET: --Do you prefer a wall mount open-frame rack or an enclosed cabinet? Open frame is fine since it will be secured on the wall in a closet.